icon_widget_image Sunday-Thursday: 9am to 5pm; Satuday: 10ap to 2pm icon_widget_image State of Qatar icon_widget_image +974 6651 6682 +353 59 9131711 +353 85 152671 icon_widget_image info@atlantech.com.co

St. Bernard’s Hospital at Europort Gibraltar

St. Bernard’s Hospital at Europort Gibraltar

Client: St. Bernard’s Hospital at Europort Gibraltar
Construction Value: 38.5 million GBP
Our Role:

Description:

The new St Bernard’s Hospital, constructed by converting an existing office block at Europort (three times the size of the old hospital), represented a 60,000,000Gbt plus investment in health for current and future generations.
Work on the project commenced on 8 July 2002 involving radically altering the inner areas of the existing Buildings 1–4, to adapt them to the needs of a modern hospital. The hospital is operated by the Gibraltar Health Authority, a department of the Government of Gibraltar with the purpose of providing health care to the residents of Gibraltar.
The hospital was designed for 210 beds covering Ortho trauma, maternity, surgical, medical and pediatric wards, two main operating theaters, emergency backup theatre, a hydrotherapy pool with a full rehabilitation clinic, cardiac rehabilitation, accident and emergency department with a provision for major incidents and ophthalmic clinics. The scope of work for this development included MEP construction, installation testing and commissioning, maintenance and operation of various facilities including CCTV.
J/V Building contractors
Fitzpatrick / Rotary International

In February 2004, St. Bernards Hospital commenced operations.

 

Project Info

Category:
Date: